Staub-electronics SM-PROJ-XL-BLK STRONG - UNIVERSAL FINE ADJUST PROJ Uživatelský manuál Strana 8

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 12
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 7
Pg. 8
SM-PROJ-XL Installation Manual
© 2013 Strong
®
After the projector has been attached to the mounting
base, it can be attached to the projector mount body.
Step 6. Hanging the Projector
1. Lift the projector and position the front lip of the
mounting base (C) at the bottom-rear of the mount
body(B),andslideitintotheopening.(Figure10)
The mounting base should slide into the body with
ease with the rails engaged on both sides.
Note: Ifthemountingbasewillnotslidecompletely
onto the mount body, the mounting base
or the mount body has been installed
backwards, or the screws (E) are in place
and must be removed.
Figure 10
Figure 11
Figure 12
Projection Screen
(B)
(C)
Projection
Screen
(E)
(E)
2. Next, insert the screws (E) back into the holes on
the base as shown, and leave them loose enough
to allow the mounting base to slide forward and
backward.(Figure11)
Note: Lift the projector some when threading in the
screwstoavoidcross-threading.
3. Now let the projector hang from the mount. If the
projector leans forward or backward, slide the base in
themountbodytocorrecttheimbalance.(Figure12)
4. Afterthenaturalpositionforthebestbalanceisfound,
tightenall4screws(E)securelyusingthe3mmAllen
wrench (T2).
\
Projection Screen
Zobrazit stránku 7
1 2 3 4 5 6 7 8 9 10 11 12

Komentáře k této Příručce

Žádné komentáře